Loading...
2025-156 (8)Andrew Bulson From: Dutcavich, Mathew <mdutcavich@dutchessny.gov> Sent: Monday, June 23, 2025 9:46 AM To: Andrew Bulson; Trifilo, William Cc: Gill, Stephen; Christian Paggi; Jamie DiMattia Subject: RE: Wappingers Falls MHP - HWP Application for a Municipal Water Extension on CR104, Town of Wappinger And rew, This revision looks good, consider this email our acceptance. The contractor can reach out to Bill directly for permits when the time comes. Thanks, Matt Dutcavich, P.E. Director of Engineering Dutchess County Dept. of Public Works - Engineering Division 626 Dutchess Turnpike Poughkeepsie, NY 12603 Phone: (845) 486-2925 Fax: (845) 486-2940 Email: mdutcavich@dutchessny.gov www.dutchessny.gov From: Andrew Bulson <abulson@paggiengineers.com> Sent: Thursday, June 12, 2025 12:29 PM To: Dutcavich, Mathew <mdutcavich@dutchessny.gov>; Trifilo, William <wtrifilo@dutchessny.gov> Cc: Gill, Stephen <sgill@dutchessny.gov>; Christian Paggi <cpaggi@paggiengineers.com>; Jamie DiMattia <jdimattia@paggiengineers.com> Subject: RE: Wappingers Falls MHP - HWP Application for a Municipal Water Extension on CR104, Town of Wappinger Matt and Bill, Please find attached a response letter and revised plans for the Waterline extension to Wappingers Falls MHP at the above -referenced location. I've also attached an email from Dan Keeler, PE, of the Dutchess County Health Department from June 4, 2025, which indicates conceptual approval of the attached revised plan. Please let me know if you require any physical copies of the attached to complete your review. Please don't hesitate to contact me if you have any questions or concerns regarding this project. Thankyou, Andrew Bulson, EIT Project Engineer Lawrence J. Paggi, PE, PC 43 Broad Street Fishkill, NY 12524 (845) 897-2375 ext. 108 abut E.baagga gun rs.c0u. D PAGGI F ENGINEERING From: Dutcavich, Mathew <mdutcavich dutchessn ov> Sent: Thursday, April 10, 2025 2:39 PM To: Andrew Bulson <abuls�:nn a , Mien iineeirs„c�:nm>; Trifilo, William <wtLuful�:n dutchessn „ �:nv> Cc: Gill, Stephen <sgii dutchessny„g�:nv>; Christian Paggi <ca , l a ien ineeirs„c�:nm>; Jamie DiMattia < I mattua a engineersi„corn> Subject: RE: Wappingers Falls MHP - HWP Application for a Municipal Water Extension on CR104, Town of Wappinger And rew, • The section at the berm shows fill that could potentially cause the guide rail to no longer meet criteria for height. A note to reset rail as necessary does not adequately address this. The rail cannot locally be raised to go up and over a berm in this short distance and we will not allow it to be reinstalled in a manner that reduces the shoulder width. The berm must be fully outside of the deflection distance of the guide rail. • The above is resolved by going underneath the culvert pipe. When this pipe gets replaced, the County would be responsible for the cost of any temporary or permanent relocations to get water main of the way of the work. Placing the main under the culvert now eliminates that future cost to the County and resolves the issues with the proposed berm and its impact on guiderail and potential roadside drainage. Thanks, Matt Dutcavich, P.E. Director of Engineering Dutchess County Dept. of Public Works - Engineering Division 626 Dutchess Turnpike Poughkeepsie, NY 12603 Phone: (845) 486-2925 Fax: (845) 486-2940 Email: mdutcavich@dutchessny.gov www.dutchessny.gov From: Andrew Bulson <abulscm a , ien uneeirs„c�:nm> Sent: Thursday, April 10, 2025 12:29 PM To: Dutcavich, Mathew <mdutcavich dutchessn ov>; Trifilo, William <wt(fik.-) dutchessn „ c)v> Cc: Gill, Stephen <sgiill@dutchessn .Lc)v>; Christian Paggi <ca iia ien uneers„c�:nm>; Jamie DiMattia <' mattua a en iine rrs„co > Subject: RE: Wappingers Falls MHP - HWP Application for a Municipal Water Extension on CR104, Town of Wappinger Good afternoon Bill & Matt, Just checking in on the status of your review of this project. Please let me know if you have any questions or concerns or require any additional information. Thankyou, Andrew Bulson, EIT Project Engineer Lawrence J. Paggi, PE, PC 43 Broad Street Fishkill, NY 12524 (845) 897-2375 ext. 108 aa buUs onCinaggiiengiin,Neirsw�;ou�u D PAGGI F ENGINEERING From: Andrew Bulson Sent: Tuesday, March 25, 2025 11:04 AM To: Dutcavich, Mathew <mdutcavuch dutchessn —>; Trifilo, William <wt(f k.- dutchessn „ cw> Cc: Gill, Stephen <s iill dutchessny,, u:nv>; Christian Paggi <ca , l a uen uneeirs„comm>; Jamie DiMattia < I mattua a engineersi„com> Subject: RE: Wappingers Falls MHP - HWP Application for a Municipal Water Extension on CR104, Town of Wappinger Thank you, Matt. We look forward to hearing back from you on the revised submission. Best, Andrew Bulson, EIT Project Engineer Lawrence J. Paggi, PE, PC 43 Broad Street Fishkill, NY 12524 (845) 897-2375 ext. 108 abut E.b agger gun rs. 0d. From: Dutcavich, Mathew <rndutcavich dutchessn „ OV> Sent: Friday, March 21, 2025 2:16 PM To: Andrew Bulson <abuls�:nn a ien iineeirs„c�:nm>; Trifilo, William <wtfful�:n dutchessn „ �:nv> Cc: Gill, Stephen <sll dutchessn ., ..-)v>; Christian Paggi <ca , ii a ien ineeirs„c�:)rn>; Jamie DiMattia <14Lmatua@PaEgiengineers„Corn> Subject: RE: Wappingers Falls MHP - HWP Application for a Municipal Water Extension on CR104, Town of Wappinger And rew, The complete streets checklist by policy is supposed to be submitted with permit applications. I agree that given the nature of the work we can give you relief from it for this one. Thanks, Matt Dutcavich, P.E. Director of Engineering Dutchess County Dept. of Public Works - Engineering Division 626 Dutchess Turnpike Poughkeepsie, NY 12603 Phone: (845) 486-2925 Fax: (845) 486-2940 Email: mdutcavich@dutchessny.gov www.dutchessny.gov From: Andrew Bulson <abulscm a , ien uneeirs„c�:nm> Sent: Thursday, March 20, 2025 5:30 PM To: Trifilo, William <wt(ful�:)dutchessn „ �:nv> Cc: Dutcavich, Mathew <mdutcavich dutchessn ov>; Gill, Stephen <s ull dutchessny,, �:nv>; Christian Paggi <c a ii a uen ineeirs„c�:nm>; Jamie DiMattia <j mattia a [en iineeirs„c�:nm> Subject: Wappingers Falls MHP - HWP Application for a Municipal Water Extension on CR104, Town of Wappinger Good evening Bill, Please find attached a letter in response to your comments from a February 27 email, along with attachments and revised plans for the above referenced project. Regarding the Complete Streets Checklist— Given that this project is only utilitywork, I'm not sure the checklist applies to this project. I will be out until Tuesday 3/25, but if you have anyfurther comments or concerns or would like to discuss this further, please don't hesitate to contact me. Thankyou, Andrew Bulson, EIT Project Engineer Lawrence J. Paggi, PE, PC 43Broad Street F|nhkiiLNY12524 400 ENGINEERING