2025-123 (2)It, ih
Rommel[MAMM,
'�wmm'
129 Park Road
Queensbury, NY :i-
;,
We hereby submit budgetary specifications and estimates for the following:
1. All Labor, material, and equipment to perform all digging, backfill, and slab prep only for a
45'X72' Pre -Engineered Metal Building with a wash bay. Building Specs are attached in hand
sketches. Basic drawings to get permits for the engineered building are included in price below
but may need some additional depending on requirements from town (engineered foundation
and PEMB included). Foundation is figured on 2'x1' footing with an 8" wall 5' tall from that.
The slab will be 8" throughout the space. This building is to be completely free-standing from
the existing structure it buts up to. Insulation is included to meet code. 5 O.H. Doors at 12'
Wide by 14' high also included. As well as 5 -man doors (3070) three of which are exterior and
2 interior. Rozell will also install basic electrical throughout the new space. This will be low
bay LED's and outlets to meet code. Hanging heaters will be provided in the space for heat.
Floor drains in the slab included to go out to a oil water separator and then holding tank.
Louvers and exhaust fan similar to the mechanics shop also included. A partition wall for the
wash bay is included and the intent is to wrap this is 2 layers of sheetrock with FRP (washable
surface on the exterior). I've included some blasting for rock but we will need to revisit this
depending on foundation design and getting a holding tank and oil water separator
underground. All Labor, Material, and equipment to replace the roof on block building
adjacent to our new structure. Included in the budgetary pricing is the stripping of the existing
roof, a budgetary estimate to have an engineering study done on the property to determine the
extent of re -enforcing the roof. Once study is done and roof stripped, I have figured on re -
enforcing 15% of the roof trusses to get them up to code in pricing below. Once up to code and
deemed safe Rozell will install a new rubber roof over this structure.
Based on Straight Time
Description
PROPOSAL
ATTENTION:
Mr. Michael Sheehan
Date:
5/16/2025
Proposal No:
25-7384
Proposal Submitted to:
Town of Wappinger Falls Highway Department
Address:
10 Highway Drive
Wappinger Falls, NY 12590
Phone:
(845)-297-9451
Email:
msheehantownofwappingerny.t;cw
Job Name:
Garage #3
We hereby submit budgetary specifications and estimates for the following:
1. All Labor, material, and equipment to perform all digging, backfill, and slab prep only for a
45'X72' Pre -Engineered Metal Building with a wash bay. Building Specs are attached in hand
sketches. Basic drawings to get permits for the engineered building are included in price below
but may need some additional depending on requirements from town (engineered foundation
and PEMB included). Foundation is figured on 2'x1' footing with an 8" wall 5' tall from that.
The slab will be 8" throughout the space. This building is to be completely free-standing from
the existing structure it buts up to. Insulation is included to meet code. 5 O.H. Doors at 12'
Wide by 14' high also included. As well as 5 -man doors (3070) three of which are exterior and
2 interior. Rozell will also install basic electrical throughout the new space. This will be low
bay LED's and outlets to meet code. Hanging heaters will be provided in the space for heat.
Floor drains in the slab included to go out to a oil water separator and then holding tank.
Louvers and exhaust fan similar to the mechanics shop also included. A partition wall for the
wash bay is included and the intent is to wrap this is 2 layers of sheetrock with FRP (washable
surface on the exterior). I've included some blasting for rock but we will need to revisit this
depending on foundation design and getting a holding tank and oil water separator
underground. All Labor, Material, and equipment to replace the roof on block building
adjacent to our new structure. Included in the budgetary pricing is the stripping of the existing
roof, a budgetary estimate to have an engineering study done on the property to determine the
extent of re -enforcing the roof. Once study is done and roof stripped, I have figured on re -
enforcing 15% of the roof trusses to get them up to code in pricing below. Once up to code and
deemed safe Rozell will install a new rubber roof over this structure.
Based on Straight Time
Description
Pricing
1
$1,538,000.00
Engineering
$40,000.00
Total Lump Sum
$1,578,000.00
Total Lump Sum Price: See Above
EXCLUSIONS:
1. Tax 3. Liquidated Damages
2. Hazardous Material Abatement 4. Paving
5. Final Site Grading
6. Service for electrical
7. Service for mechanical requirements
8. Blasting of rock
We propose hereby to furnish material and labor - complete in accordance with above specifications, for the sutra of:
Budgetary Price: See Above (Budgetary Price)
See Above (Budgetary Price)
Payment to be made as follows: Payment due 30 days from invoice date. 1 %z% interest due after due date.
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or
deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the
estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance.
Our workers are fully covered by Workmen's Compensation Insurance.
Authorized Signature: Acceptance of Proposal:
3 g jjL a*Yuh/ R*I X
Ben Firlit Date:
Project Engineer
5/16/2025
NOTE: This proposal may be withdrawn by us if not accepted in 10 days.
"l)ue to Hie io,v,vibi1i gf,vtaae/ anti aluminum taral Baa°iim),io,ved, maerial),iaic°aa°,v mY baa° ,vl�jec
is
WARRANTY FOR ESTIMATES:
ROZELL INDUSTRIES, INC. ("ROZELL") warrants to Customer that all materials supplied by ROZELL
will substantially conform to the material specifications, drawings or other technical
requirements provided to ROZELL and agreed to by ROZELL in writing and will comply with all
applicable laws, codes and regulations. ROZELL warrants that all labor and installation services
will be of good, workmanlike quality, taking into account existing conditions at the site where
work is done. ROZELL does not warrant parts or labor supplied by others and is not responsible
for damage resulting from defective design or plans, following Customers' instruction or
directions, abuse or misuse of the equipment or facilities repaired by ROZELL delays caused by
inclement weather or Acts of God. ROZELL will pass on to Customer any manufacturer warranties
on parts and equipment to the extent such warranties are assignable. This warranty shall be in
effect for a period of one (1) year from the date of substantial completion of ROZELL's work, or
the date the equipment or facility being repaired is placed into actual operation, whichever is
earlier. ROZELL shall be notified in writing of any defect within thirty (30) days of the defect
becoming known to Customer. ROZELL's sole liability is limited to repair, replacement or
adjustment of defective parts and/or correction of defective workmanship on the part of ROZELL
personnel, at ROZELL's cost, in order to place the equipment in working order. In no event shall
ROZELL be liable for consequential or special damages, or for any loss of productivity, revenues or
profits on account of such defect.
THIS WARRANTY IS EXPRESSLY MADE IN LIEU OF ANY AND ALL OTHER WARRANTIES, EXPRESS OR
IMPLIED, INCLUDING THE WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR
PURPOSE.
No waiver of the provisions is enforceable unless made in written document signed by an officer
of ROZELL. This warranty and the limitations contained herein form part of the agreement
between ROZELL and Customer, are not replaced or superseded by any purchase order,
agreement or term sheet issued by Customer, whether before or after the date of this estimate.
HOLD HARMLESS AGREEMENT
To the fullest extent permitted by law, The Customer will indemnify and hold harmless
Rozell Industries, Inc., Rozell East, Inc. and Rozell North, Inc., their officers, directors, partners,
representatives, agents and employees from and against any and all claims, suits, liens,
judgements, damages, losses and expenses including legal fees and all court costs and liability
(including statutory liability) directly or indirectly arising in whole or in part from any labor
dispute, unfair labor practice charge, grievance or cause of action under State or Federal Law or
pursuant to any Collective Bargaining Agreement in connection with Customer contracting work
or services from Rozell Industries, Inc., Rozell East, Inc. or Rozell North, Inc.
129 Park Road * Queensbury, NY 12804 * PH: (518) 793-2634 * Fax: (518) 615-0162 * TF: (877) 501-0055 * www.rozellind.com