Loading...
2025-123 (2)It, ih Rommel[MAMM, '�wmm' 129 Park Road Queensbury, NY :i- ;, We hereby submit budgetary specifications and estimates for the following: 1. All Labor, material, and equipment to perform all digging, backfill, and slab prep only for a 45'X72' Pre -Engineered Metal Building with a wash bay. Building Specs are attached in hand sketches. Basic drawings to get permits for the engineered building are included in price below but may need some additional depending on requirements from town (engineered foundation and PEMB included). Foundation is figured on 2'x1' footing with an 8" wall 5' tall from that. The slab will be 8" throughout the space. This building is to be completely free-standing from the existing structure it buts up to. Insulation is included to meet code. 5 O.H. Doors at 12' Wide by 14' high also included. As well as 5 -man doors (3070) three of which are exterior and 2 interior. Rozell will also install basic electrical throughout the new space. This will be low bay LED's and outlets to meet code. Hanging heaters will be provided in the space for heat. Floor drains in the slab included to go out to a oil water separator and then holding tank. Louvers and exhaust fan similar to the mechanics shop also included. A partition wall for the wash bay is included and the intent is to wrap this is 2 layers of sheetrock with FRP (washable surface on the exterior). I've included some blasting for rock but we will need to revisit this depending on foundation design and getting a holding tank and oil water separator underground. All Labor, Material, and equipment to replace the roof on block building adjacent to our new structure. Included in the budgetary pricing is the stripping of the existing roof, a budgetary estimate to have an engineering study done on the property to determine the extent of re -enforcing the roof. Once study is done and roof stripped, I have figured on re - enforcing 15% of the roof trusses to get them up to code in pricing below. Once up to code and deemed safe Rozell will install a new rubber roof over this structure. Based on Straight Time Description PROPOSAL ATTENTION: Mr. Michael Sheehan Date: 5/16/2025 Proposal No: 25-7384 Proposal Submitted to: Town of Wappinger Falls Highway Department Address: 10 Highway Drive Wappinger Falls, NY 12590 Phone: (845)-297-9451 Email: msheehantownofwappingerny.t;cw Job Name: Garage #3 We hereby submit budgetary specifications and estimates for the following: 1. All Labor, material, and equipment to perform all digging, backfill, and slab prep only for a 45'X72' Pre -Engineered Metal Building with a wash bay. Building Specs are attached in hand sketches. Basic drawings to get permits for the engineered building are included in price below but may need some additional depending on requirements from town (engineered foundation and PEMB included). Foundation is figured on 2'x1' footing with an 8" wall 5' tall from that. The slab will be 8" throughout the space. This building is to be completely free-standing from the existing structure it buts up to. Insulation is included to meet code. 5 O.H. Doors at 12' Wide by 14' high also included. As well as 5 -man doors (3070) three of which are exterior and 2 interior. Rozell will also install basic electrical throughout the new space. This will be low bay LED's and outlets to meet code. Hanging heaters will be provided in the space for heat. Floor drains in the slab included to go out to a oil water separator and then holding tank. Louvers and exhaust fan similar to the mechanics shop also included. A partition wall for the wash bay is included and the intent is to wrap this is 2 layers of sheetrock with FRP (washable surface on the exterior). I've included some blasting for rock but we will need to revisit this depending on foundation design and getting a holding tank and oil water separator underground. All Labor, Material, and equipment to replace the roof on block building adjacent to our new structure. Included in the budgetary pricing is the stripping of the existing roof, a budgetary estimate to have an engineering study done on the property to determine the extent of re -enforcing the roof. Once study is done and roof stripped, I have figured on re - enforcing 15% of the roof trusses to get them up to code in pricing below. Once up to code and deemed safe Rozell will install a new rubber roof over this structure. Based on Straight Time Description Pricing 1 $1,538,000.00 Engineering $40,000.00 Total Lump Sum $1,578,000.00 Total Lump Sum Price: See Above EXCLUSIONS: 1. Tax 3. Liquidated Damages 2. Hazardous Material Abatement 4. Paving 5. Final Site Grading 6. Service for electrical 7. Service for mechanical requirements 8. Blasting of rock We propose hereby to furnish material and labor - complete in accordance with above specifications, for the sutra of: Budgetary Price: See Above (Budgetary Price) See Above (Budgetary Price) Payment to be made as follows: Payment due 30 days from invoice date. 1 %z% interest due after due date. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workmen's Compensation Insurance. Authorized Signature: Acceptance of Proposal: 3 g jjL a*Yuh/ R*I X Ben Firlit Date: Project Engineer 5/16/2025 NOTE: This proposal may be withdrawn by us if not accepted in 10 days. "l)ue to Hie io,v,vibi1i gf,vtaae/ anti aluminum taral Baa°iim),io,ved, maerial),iaic°aa°,v mY baa° ,vl�jec is WARRANTY FOR ESTIMATES: ROZELL INDUSTRIES, INC. ("ROZELL") warrants to Customer that all materials supplied by ROZELL will substantially conform to the material specifications, drawings or other technical requirements provided to ROZELL and agreed to by ROZELL in writing and will comply with all applicable laws, codes and regulations. ROZELL warrants that all labor and installation services will be of good, workmanlike quality, taking into account existing conditions at the site where work is done. ROZELL does not warrant parts or labor supplied by others and is not responsible for damage resulting from defective design or plans, following Customers' instruction or directions, abuse or misuse of the equipment or facilities repaired by ROZELL delays caused by inclement weather or Acts of God. ROZELL will pass on to Customer any manufacturer warranties on parts and equipment to the extent such warranties are assignable. This warranty shall be in effect for a period of one (1) year from the date of substantial completion of ROZELL's work, or the date the equipment or facility being repaired is placed into actual operation, whichever is earlier. ROZELL shall be notified in writing of any defect within thirty (30) days of the defect becoming known to Customer. ROZELL's sole liability is limited to repair, replacement or adjustment of defective parts and/or correction of defective workmanship on the part of ROZELL personnel, at ROZELL's cost, in order to place the equipment in working order. In no event shall ROZELL be liable for consequential or special damages, or for any loss of productivity, revenues or profits on account of such defect. THIS WARRANTY IS EXPRESSLY MADE IN LIEU OF ANY AND ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING THE WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. No waiver of the provisions is enforceable unless made in written document signed by an officer of ROZELL. This warranty and the limitations contained herein form part of the agreement between ROZELL and Customer, are not replaced or superseded by any purchase order, agreement or term sheet issued by Customer, whether before or after the date of this estimate. HOLD HARMLESS AGREEMENT To the fullest extent permitted by law, The Customer will indemnify and hold harmless Rozell Industries, Inc., Rozell East, Inc. and Rozell North, Inc., their officers, directors, partners, representatives, agents and employees from and against any and all claims, suits, liens, judgements, damages, losses and expenses including legal fees and all court costs and liability (including statutory liability) directly or indirectly arising in whole or in part from any labor dispute, unfair labor practice charge, grievance or cause of action under State or Federal Law or pursuant to any Collective Bargaining Agreement in connection with Customer contracting work or services from Rozell Industries, Inc., Rozell East, Inc. or Rozell North, Inc. 129 Park Road * Queensbury, NY 12804 * PH: (518) 793-2634 * Fax: (518) 615-0162 * TF: (877) 501-0055 * www.rozellind.com